Software Cost Estimation

Software cost estimation is a crucial aspect of software engineering that helps organizations determine the resources, time, and budget required to complete a software project successfully. Accurately estimating software costs is essential to ensure that the project remains on track and is completed within the allocated budget and time frame. In software engineering, cost estimation involves assessing the size and complexity of a project and predicting the necessary resources required to complete the project. Various techniques and models are employed to make these estimates, including expert judgment, algorithmic methods, and statistical models. This process is crucial to the success of any software project and requires careful attention to detail and experience to achieve accurate results.

When starting a new software project, it’s crucial to have a clear understanding of the development cost and timeline. But how is this information obtained? To estimate accurately, there are several approaches that share common attributes:

  • Defining the project scope is necessary before commencing development.
  • Using software metrics to support the evaluation process.
  • Breaking down the project into smaller components, each of which is estimated independently.
  • There are various options available to achieve an accurate cost and schedule estimate, including:
    • Estimating delays
    • Utilizing symbol decomposition techniques to generate project cost and schedule estimates
    • Implementing one or more automated estimation tools.

Cost Estimation Models

When it comes to cost estimation models, there are two types: static and dynamic. A static model relies on a single variable to calculate cost and time, while a dynamic model considers all variables as interdependent, and there is no primary variable.

Software Cost Estimation Models in Software Engineering

Static, Single Variable Models

A static model uses a single variable, such as size or lines of code, to calculate values like cost, time, and effort. The most common equation for a static, single-variable model is:
C = aL^b

Where C represents costs, L represents the size, and a and b are constants.

E = 1.4L^0.93
DOC = 30.4L^0.90
D = 4.6L^0.26

Here, E represents an effort in person-months, DOC represents documentation in a number of pages, D represents the duration in months, and L represents the number of lines per code.

Static, Multivariable Models

static, multivariable models based on method (1) that use several variables to describe different aspects of the software development environment. These models combine selected equations that incorporate these variables to estimate time and cost.

The models developed by Walston and Felix at IBM are examples of multivariable models. They provide the following equations that relate lines of source code to effort and duration of development, respectively:

E = 5.2L^0.91

D = 4.1L^0.36

Additionally, the productivity index incorporates 29 variables that have a high correlation with productivity. The weight factor for the ith variable is Wi, and the estimator gives Xi = {-1, 0, +1} depending on whether the variable decreases, has no effect, or increases productivity. This index is useful for software cost estimation.Software Cost Estimation 2

 

Uses of Cost Estimation Models in Software Engineering

  • Helps to determine the number of engineers required for the project during the planning stage.
  • Aids in developing a schedule for the project during the planning stage.
  • Assists in monitoring the project’s progress during implementation.
  • Cost estimation can help identify potential risks and uncertainties associated with a project, enabling project managers to develop appropriate risk management plans.
  • Cost estimation techniques can be used to analyze different project scenarios and compare the expected costs and benefits of each scenario.
  • Accurate cost estimation can help improve project planning and reduce the risk of project failures due to poor resource allocation or schedule overruns.

Hope the candidates who are here to know details about the Software Cost Estimation have found this article worthwhile. Make sure you follow our tutorials.freshersnow.com for more interesting updates.